Guide to installation
Before Installing It
You Should Know This!

Improper storage will void any warranty due to damage by direct sunlight or not being able to breath in a confined location.

If EZ Liner has been packaged and shipped on a skid, cut all straps and loosen any 2 x 4 so the material is not restricted from expansion in a confined environment.

All material should be climatized for 24 hours in the installation location to a minimum of 40 degrees fahrenheit (5 degrees celcius) prior to installation.

Improper storage will void any warranty due to damage by direct sunlight or not being able to breath in a confined location.

All material should be climatized for 24 hours in the installation location to a minimum of 40 degrees fahrenheit (5 degrees celcius) prior to installation.
Recommended Tools

Battery Drill

Square & Straight Edge

Chalk Line

Box Cutter

Ladders/ Scaffolding

Rubber Mallet

Rotary Hammer Drill

Drill C/W Hole Saws

Caulking Gun

Tape Measure
